Head Image News
29 APR 2019

Exceptional results for Black Cat Syndicate within SAM target

Black Cat Syndicate Limited (“Black Cat” or “the Company”) is pleased to announce an update on activities at the Bulong Gold Project (“Bulong”), including results for the second 2019 drilling program designed to extend and infill Resources at Myhree.

SAM Geophysical Surveys Along the Myhree-Boundary Corridor
Interpretation of the SAM survey completed in December 2018 (ASX: 20 December 2018) has led to the definition of four priority drill targets between Myhree and Boundary (see Figure 3). The NE orientation of SAM Targets 1-3 is consistent with lode orientations observed at both Myhree and Boundary and are interpreted as similar shear structures. Sam Target 4 (see Figure 3) is a major NS oriented structure running along the Myhree-Boundary Corridor. The intersections of the NS and NE targets are expected to be particularly prospective.

SAM Target 2 also had three RC holes for 300m drilled and with results also outstanding.

Read the full ASX release here. Source Black Cat Syndicate